Projects completed-Longchuan Road Binhe Greenway (Dongfeng Bridge-Jiuyi Bridge, Gehou Bridge) [Back]




    
(东风桥-隔后桥、九一桥)改造项目 2016年市委、市政府为民办实事重中之重项目,配合龙川路沿街立面改造工程对龙津河沿线绿道进行系统改造。 The reconstruction project of Longyan Binhe Green Road (Dongfeng Bridge-Gehou Bridge, Jiuyi Bridge) is the most important project for the municipal government in 2016. Perform system modification. The project started from Dongfeng Bridge, and finally separated from the rear bridge and Jiuyi Bridge. The total length is about 1,700 meters, the bicycle path is 3 meters wide, and the pedestrian walkway is 2.5 meters wide. The total investment of the project is about 30 million yuan.


项目于 2016年9月开工建设,计划于2017年春节前基本完工投入使用。 The project started construction in September 2016, and is planned to be basically completed and put into use before the 2017 Spring Festival. After the project is completed, it can effectively combine the traffic lines and the original sidewalks to connect natural nodes, human nodes, urban public space and urban residential areas, providing a good place for citizens to relax.