Projects completed-Shexing Bridge and wiring on both sides [Back]


于龙津河东风桥下游约 580米,为城市次干道,横跨龙津河,将社兴的东兴路与登高东路连接起来。 The Shexing Bridge and the wiring on both sides are located about 580 meters downstream of the Dongfeng Bridge of the Longjin River . It is an urban secondary road that crosses the Longjin River and connects Shexing's Dongxing Road with Denggao East Road. The total length of the road is 224 meters, the Shexing Bridge is 133 meters long, the bridge is 25 meters wide, two-way four lanes and 5 meters wide non-motorized vehicles and sidewalks. The designed speed is 30km / h. The total investment of the project is 30 million yuan.

     2016年1月开工,2017年春节前基本实现通行。 The project started in January 2016, and it will be basically accessible before the 2017 Spring Festival. After the project is completed, it will be of great significance to the safety and efficiency of the surrounding citizens.