Projects completed-Hualian Road [Back]

Project Overview: The starting point of the Hualian Road renovation project is at the intersection of Longteng Road and the end point is at the intersection of Xi'an Road. The total length of the road reconstruction is 1200 meters. After the road reconstruction, the cross-section distribution form is 4.5 meters of sidewalks-14 meters of roads-3 meters of central partition-14 meters of roads-4.5 meters of sidewalks, with a total width of 40 meters. The pavement structure adopts 1cm thick rubber asphalt stress absorption layer + 8cm thick AC-20C type medium-grain rubber modified asphalt concrete leveling layer + 4cm thick SMA-13 fine-grain rubber modified asphalt concrete surface layer.

The project started on June 28, 2012 and was completed on September 30, 2012, with an investment of about 15 million yuan. After the project is completed, the road traffic and comfort are greatly improved.